⃪  Back to Products

Well Intervention Towers

Enerion Modular Well Intervention Tower is designed for maximum flexibility and optimum well access, to accommodate deployment of long sections BHA.

The WIT 72 are built in modules and equipped with iso-locks for quick and efficient rig up on location, giving flexibility for rig-up height. Each module has a weight below 10 MT.

The WIT 72 is built in modules and can be designed and built according to client’s requirements, with respect to height and width.

By combining Enerion 2-legged jacking frame design, lifting for disconnecting quick connection and skidding horizontal from well centre is optimized, and gives free access for BHA installation.

To minimize transport and lift, the WIT 72 is designed to store pressure control components inside the modules during mobilization and rig-up. Resulting in reduced rig-up time at location.

Sufficient lighting is provided at all levels, approved for use in Zone 1 areas.
Option for tension table can be delivered integrated in the working deck level. The tension table is designed for up to 72 metric ton tension.

Enerion Coiled Tubing Tower

Technical Specifications

 

Height To customer specifications
Section sizes  To customer specifications
Module locking mechanism ISO locks
Hydraulic supply skidding system Auxillary, 107 bar/ 3000psi
Electric supply lights 220-254 VAC, 50/60Hz
Ambient Temperature -14°C to +55°C
Lifting certification DNV-ST-E273
Compliance ATEX, CE, PED, NORSOK
Optional equipment Jacking Frame, Tension table
Enerion Coiled Tubing Tower

In case of contingency, the horizontal skidding capabilities provides sufficient space for rigging up wireline alongside the jacking frame. In addition, a separate deck for wireline operations can be delivered to provide a suitable work deck at the different modules below working deck.

Options and Accessories:

  • Spacer frame for increased rig up height including stairs and access platforms.
  • Winch for pulling in and stabbing coiled tubing into injector.
  • Various access arrangements, according to planned rig up.
  • Mechanical and hydraulic operated turntable for injector.
  • Hydraulic operated injector tilting system.
  • Hydraulic lifting cylinder or screw drive.
  • BHA lifting equipment.
  • Wireline handling.
  • Tension Table

With more than 25 years of experience in multidisciplinary engineering, equipment design, manufacturing, and field services, our team is dedicated to helping customers improve performance, reduce risk, and achieve their operational goals.

 

 

Enerion Coiled Tubing Tower

We’re here to help you find the right solution.

Our engineering team can help you find the right solution for your project. Contact us to discuss your requirements or request a quotation.

For more information please contact

Contact Enerion Norway:
t: +47 51 31 43 00
e: post@enerion.com

Management:
Gisle Ødemotland, CEO
m: +47 92 22 42 52
e: gisle@enerion.com

Contact Enerion UK:
t: +44 (0) 1467 268320
e: post@enerion.com